Commercial Roof Refurbishment at 36–38 Fore Street, St Austell
Cornwall’s buildings face harsh weather, and storm damage can leave roofing systems in need of major repair. Restoring a damaged roof requires careful attention to both the waterproof covering and the construction beneath it, ensuring that each element works together to protect the property.
This was the challenge at 36–38 Fore Street in St Austell, where Storm Goretti had damaged parts of the roof on an existing commercial building. Pellow Roofing carried out a refurbishment that involved removing the existing asphalt coverings, creating a new roof fall, and installing a Bauder Flex built-up felt roofing system.
The challenge
The project required several stages of work to prepare the roof for its new waterproof covering. Alongside removing the existing asphalt, our team needed to install new firrings to create a new fall before rebuilding and waterproofing the roof.
Although often described as flat, a flat roof needs a slight slope to help rainwater travel towards its drainage points. Forming this fall was an important part of the refurbishment, allowing the rebuilt roof and its new waterproofing system to work together effectively.
The work therefore addressed more than the visible roof covering. It also involved carefully preparing the construction beneath it to support the finished installation.
Rebuilding the roof
Our team began by removing the existing asphalt coverings, preparing the roof for the next stage of the refurbishment. This allowed us to install the new firrings and shape the revised roof profile.
Firrings are tapered timber sections used to create a slope within a roof’s construction. At Fore Street, these formed the new fall, providing the required profile before the roof was rebuilt.
Careful preparation at this stage was essential. Establishing the fall beneath the waterproof covering helped create a suitable base for the Bauder Flex system and supported the roof’s ability to shed rainwater once completed.
Installing the waterproofing system
With the rebuilding work complete, Pellow Roofing installed a Bauder Flex built-up felt roofing system to provide the new waterproof covering.
The installation followed the newly formed roof profile, bringing together the underlying construction and the finished waterproof surface. Each stage of the refurbishment supported the same objective: restoring the roof’s protection after the storm damage.
Using the specified Bauder Flex system, our team completed the waterproofing work as the final stage of the roof refurbishment.
The finished result
The project was completed on 1 September, leaving the commercial property at 36–38 Fore Street with a rebuilt and newly waterproofed roof.
The refurbishment included removing the existing asphalt, installing new firrings to establish the roof fall, and installing a Bauder Flex built-up felt system. Together, these works renewed the roof covering and provided a slope to support rainwater drainage.
Pellow Roofing was pleased to complete this commercial roofing project in St Austell, using careful preparation and skilled workmanship to restore a storm-damaged roof.
Need help with a commercial roof in Cornwall?
Storm damage and ageing roof coverings can present different challenges for commercial properties. Understanding the roof’s condition is the first step in deciding what work is needed.
If your commercial roof needs repairs or refurbishment, contact Pellow Roofing to discuss your project and arrange an assessment.